NOTEWORTHY PROJECTS - Tony Tanna



LNG 5 Site Preparation and Temporary Facilities Package

The first contract completed on the LNG 5 project for Foster Wheeler Worley at the Burrup. Earthworks, building and services relocation, electrical, demolition, concrete and roadworks.

2005/2006 Project Director__Value $55M



Tunkawanna to Rosella Rail Duplication Bridges

Construction of 7 rail bridges in the remote north west WA for Pilbara Iron. Innovative methods were incorporated into the bridge design and construction.

2004/2005 Operations Manager Bridge__Value $20m



Churchman Brook Dam Remedial Works

Upgrade of the Dam to ANCOLD standards. Completed 4 weeks ahead of the original completion date.

2004/2005 Operations Manager__Value $7.5M



Ashburton River Bridge Project

Construction of a 240 metre long bridge and 3km of roadworks. Completed 4 weeks ahead of the original completion date.

2003/2004 Operations Manager Value__$9M



Yandicoogina Bridge Project

Construction of a incrementally launched 200 metre long steel bridge in remote north west WA.

Part of the MAC Rail Project.

2003 Operations Manager__Value $10M



Alice Springs to Darwin Railway (Manager of Major Bridges)

The construction of Major bridges over the Elizabeth, Adelaide, Cullen, Edith and Katherine Rivers, and the refurbishment of the Fergusson River Bridge. Responsible for the completion of 16 Bridges in 16 months. Completed 5 months ahead of the schedule.

2002/2003: Value__$1.2B



Callide Power Station Civil Works – Biloela Qld (Project Manager)

The construction of the plant civil works for a new 840 megawatt coal fired power station designed to the most advanced technologies for environmental performance and plant efficiency, which included 60,000 cubic metres of earthworks, 35,000 cubic metres of concrete, 3000 tonnes of structural steel and 22km of underground services. Completed on time.

1999/2000/2001: Value__$60M



Wetlands Crossing Structure (Project Manager)

The construction of a rubber lined concrete bridge pipe 2.25m in diameter incrementally launched across a wetlands area with a public access walkway mounted along the top of the pipe.

2001: Value__$1.8M



Millennium Dome, London (Site Engineer)

Survey and setting out for the ring beam and foundation construction with 12,000 cubic metres of concrete poured in 14 weeks.

1997: Value__ $10M



Fremantle Port Authority BCJ Upgrade D&C, Kwinana (Project Manager)

The design and construction of a standard gauge rail spur, public road, hardstand and lighting including features such as a dual gauge turnout and signalled level crossing.

1998: Value__ $3M



Bennett Brook Bridge, Perth (Project Manager)

The construction of the largest single span composite structure in the Southern Hemisphere.

1996: Value__ $5M



Esperance Rail Car Tipper D&C (Project Manager)

The design and construction of the civil works for the iron ore tipper in Esperance.

1994: Value__$3M

About usAbout_us.htmlhttp://livepage.apple.com/shapeimage_1_link_0
Click here to see projects completed by Brooklyn EngineeringProjects.htmlProjects.htmlshapeimage_2_link_0

© 2010 Brooklyn Engineering Pty Ltd    Tel: 0407 692 029   Email: info@brooklynengineering.com.au

PO Box 8100, South Perth Western Australia 6151

Tony Tanna CV.pdfTanna_Management_files/Tony%20Tanna%20CV.pdfProjects.htmlshapeimage_3_link_0